
Jo24
EconomyJordan27 Nov 2026, 20:37
Ibrahim Khasawneh criticizes Jordan's National Water Carrier project and compares it to Dubai's project
Machine translated | Original title: إبراهيم الخصاونة ينتقد مشروع الناقل الوطني للمياه في الأردن ويقارنه بمشروع دبي
The short version
Ibrahim Khasawneh criticized the National Water Carrier project, stating it is surrounded by ambiguity and varying costs. He compared it to the Hassyan desalination plant in Dubai, which cost 918 million dollars with a much lower water price.
Key details
- Khasawneh stated that Dubai established the Hassyan plant in partnership with ACWA Power with a capacity of 300 million cubic meters annually.
- He pointed out that water price in Dubai's project is about 27 cents per cubic meter compared to 2.70 dollars in the National Carrier.
- He recalled the oil shale electricity project experience where Jordan lost international arbitration.
Source: Jo24
Read the full story at the sourceAsk Fahim about this story
Fahim answers from this story and, when it is not there, searches the web and keeps that part separate. No opinions.
Automated answers from the story text; they can be wrong. Check the source.




Comments
Comments are checked automatically. No abuse, links or phone numbers.